8 days
So here I am
designing 2 shows
that open on the same day
1 huge musical
with large gargantuan scenery
and one small play
with intricate French Rococo Interiors
How I got conned into that last one
I'll never know
but alas, it's the final stretch
where everything takes a backseat
until the curtains go up
in exactly 8 days
Lots and Lots to do
filigree work
painting a floor to look like Parquet
constructing 2 three foot high chandeliers
That Light!
making my forced perspective actually work
and hanging 4 large comissioned paintings
and making them fly
and finding room for everything offstage
It's like the backstage at WICKED over there
at the high school, ya'll
absolutely no room for ANYTHING
so far we have one injury to report
a little girl tripped backwards over
the steel hydraulic lift
I felt terrible
It will all come together
but there is a LOT of painting to finish
will I be able to finish in time?
Stay tuned for another update
and more pictures to come!
designing 2 shows
that open on the same day
1 huge musical
with large gargantuan scenery
and one small play
with intricate French Rococo Interiors
How I got conned into that last one
I'll never know
but alas, it's the final stretch
where everything takes a backseat
until the curtains go up
in exactly 8 days
Lots and Lots to do
filigree work
painting a floor to look like Parquet
constructing 2 three foot high chandeliers
That Light!
making my forced perspective actually work
and hanging 4 large comissioned paintings
and making them fly
and finding room for everything offstage
It's like the backstage at WICKED over there
at the high school, ya'll
absolutely no room for ANYTHING
so far we have one injury to report
a little girl tripped backwards over
the steel hydraulic lift
I felt terrible
It will all come together
but there is a LOT of painting to finish
will I be able to finish in time?
Stay tuned for another update
and more pictures to come!